SAP Certified Specialist Certification E-S4CON-2025 Sample Questions Reliable [Q22-Q47]

Share

SAP Certified Specialist Certification E-S4CON-2025 Sample Questions Reliable

Prepare for the Actual SAP Certified Specialist E-S4CON-2025 Exam Practice Materials Collection

NEW QUESTION # 22
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For soome software components, you find entries in the Calculated level column.
What does the Calculated level indiicate for those software components?

  • A. The SAP Support Packages that will be bound to the conversion
  • B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • C. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner

Answer: C


NEW QUESTION # 23
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?

  • A. Silent data migration (SDM)
  • B. Downtime conversion
  • C. Shadow on target creation
  • D. Downtime migration

Answer: D


NEW QUESTION # 24
You are performing an SAP S/4HANA conversion with DMO. You entered a specific nummber of R3load processes during the Extraction Roaadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this questiion.

  • A. In SUM Parameters
  • B. In Process Control Center
  • C. In DMO Migration Preparattion
  • D. In SUM Analysis

Answer: A,B


NEW QUESTION # 25
You want to perform an SAP S/4HANA conversion using SUM with inplace DMO.
Which steps run before the beginniing of the technical downtime, irrespective of your SUM configuration? Note: There are 3 coorrect answers to this question.

  • A. Activation of dictionary objects in phase ACT_UPG
  • B. Import of upgrade and langguage data from the download directory in phase TAABIM UPG
  • C. Creation of application tablles in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATTE
  • D. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • E. Import of dictionary objects from the download directory in phase DDIC_UPG

Answer: A,B,E


NEW QUESTION # 26
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU CLONE MIG_DT_RUN
  • B. EU_CLONE MIG_DT_CREATTE
  • C. EU IMPORT ALL
  • D. EU_CLONE MIG SOT RUN

Answer: A


NEW QUESTION # 27
What is the minimum SAP BASIS rellease of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 28
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP ECC system from SAP ERP 6.0 EHP 8
  • B. Standalone AS ABAP with SAP BASIS 752
  • C. SAP S/4HANA Server 2022
  • D. SAP Solution Manager 7.2

Answer: B,C


NEW QUESTION # 29
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?

  • A. To optimize the main import
  • B. To optimize the conversion
  • C. To optimize the activation
  • D. To optimize the migration

Answer: D


NEW QUESTION # 30
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. Without table contents commparison, only 40 R3load processes are being started.
  • B. SUM is still running in uptimme; the 40 defined R3load processes are considered.
  • C. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.
  • D. These are 40 pairs of R3load processes, so there are 80 R3load processes running

Answer: D


NEW QUESTION # 31
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?

  • A. At the end of the downtimee
  • B. As part of the cleanup process
  • C. Before the downtime startss
  • D. Early in the downtime

Answer: C


NEW QUESTION # 32
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perfform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: A,B,E


NEW QUESTION # 33
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check the Charts Control Ceenter in the SUM UL
  • B. Check the log files written in the SUM directory, subdirectory abap, subdirectory log
  • C. Check logs for jobs starting with RSUPG SGEN in the SAP system.
  • D. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.

Answer: A,B


NEW QUESTION # 34
Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?

  • A. Software Orchestrator
  • B. SAP migration cockpit
  • C. SAP Business Transformatioon Center
  • D. RISE with SAP system transition workbench

Answer: D


NEW QUESTION # 35
What is the benefit of using the UPGANAXML file from a previous SUM run?

  • A. To auto-fill specific fields onn selected screens on the SUM UI
  • B. To skip selected phases durring the SUM run
  • C. To make the progress information within SUM UI more accurate
  • D. To repeat specific phases during the SUM run

Answer: C


NEW QUESTION # 36
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Custom code analysis
  • B. Unicode conversion
  • C. Database migration
  • D. Software update

Answer: C,D


NEW QUESTION # 37
What do you need to consider when performing the SI checks for an SAP S/4HANA connversion? Note: There are 2 correct answers to this question.

  • A. The errors from the SI checks must be solved; otherwise, SUM will report an errror.
  • B. You need an SAP system baased on AS ABAP 7.52 or above for the SI check frammework.
  • C. You need to build up an SI check framework by applying SAP Notes.
  • D. The Si checks are executed in the development system and the results are trannsported into the subsequent systems.

Answer: A,C


NEW QUESTION # 38
......

Ace SAP E-S4CON-2025 Certification with Actual Questions Feb 22, 2026 Updated: https://pass4sure.prep4cram.com/E-S4CON-2025-exam-cram.html