NEW QUESTION 108
Data center outsourcing and enterprise network outsourcing are the key sales scenarios of Huawei's ITO.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 109
What are the following outputs of IP network planning and design services? (Multiple choice)

  • A. Requirements analysis/modeling scenarios
  • B. Web presentation feasibility assessment report
  • C. Network migration/implementation
  • D. Gap/risk analysis report

Answer: A,B,D

 

NEW QUESTION 110
Disaster recovery consulting and planning services include information collection, analysis, strategy formulation and other services for the business environment.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 111
Huawei platform software and general middleware services include: Fusionlnsight Planning and Design Service, Fusionlnsight Solution Implementation Service, Big Data Development Support Service, and Fusionlnsight Clustering.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 112
Which maintenance services include 2 times/year equipment health check service? (Multiple choice)

  • A. Standard+
  • B. Silver+
  • C. Platinum+
  • D. silver medal
  • E. Gold+
  • F. gold medal

Answer: B,C,E

 

NEW QUESTION 113
In the pre-sale bidding stage, the customer's requirements should be fully met, even if it exceeds the training capacity, it should be reluctantly answered.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 114
Huawei's training and certification has built different delivery resources for customers, channels, students, and people, of which channel-oriented training institutions are mainly channel-oriented training institutions.

  • A. Huawei Training Centers and Branches
  • B. Huawei School of Information and Network Technology
  • C. Huawei-licensed training centers
  • D. Huawei elearning

Answer: C

 

NEW QUESTION 115
What is the quotation outline of optical network evaluation service?

  • A. Sub-racks
  • B. Net element
  • C. People/day
  • D. Site

Answer: B

 

NEW QUESTION 116
What is the customer value of disaster recovery services? (Multiple choice)

  • A. Build business continuity capabilities
  • B. Improve the efficiency of disaster recovery construction and lower the threshold for disaster recovery construction
  • C. Enhance customer disaster recovery

Answer: A,B,C

 

NEW QUESTION 117
What are the service components that the WLAN Planning and Design Service does not involve? (Multiple choice)

  • A. Integrated wiring
  • B. Needs research
  • C. Interference testing
  • D. Noise test

Answer: A,D

 

NEW QUESTION 118
According to the requirements of the international GB 50174-2008 "Electronic Information System Computer Room Design Code" for the structure, the seismic fortification of the A-class computer room should not be less than two categories.

  • A. True
  • B. False

Answer: B

 

NEW QUESTION 119
Which service items in co-care gold maintenance services are responsible for the delivery of channel partners. (Multiple choice)

  • A. Hardware support (7*24*4H).
  • B. Remote support
  • C. On-site problem handling
  • D. Service Support Plans & Reports
  • E. On-site hardware replacement
  • F. Device health check

Answer: C,D,E,F

 

NEW QUESTION 120
is not part of the data center L1 integration service interface.

  • A. firefighting
  • B. Water supply and drainage
  • C. Machine room decoration
  • D. Civil

Answer: D

 

NEW QUESTION 121
What is not included in the content of the cloud infrastructure solution implementation service?

  • A. Verify the service
  • B. Business issuance
  • C. Consult planning
  • D. Implementation and co-commissioning services

Answer: C

 

NEW QUESTION 122
the data center L1 layer industry in the deepening design stage review content is correct.

  • A. Design standard specifications
  • B. Tender documents
  • C. Construction drawings
  • D. Requirements confirmation document

Answer: C

 

NEW QUESTION 123
What methods does UniSTAR SCT Configurator support for maintenance service quotation? (Multiple choice)

  • A. Manual insertion
  • B. Configurator manual quote summary
  • C. and equipment mixed quotes
  • D. Generated by a device quote
  • E. Create service quotes separately

Answer: A,C,D,E

 

NEW QUESTION 124
For customers, the total integration mode only needs to manage one integrator, and the management difficulty and professional requirements are reduced.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 125
Huawei has carried out an integrated design from planning, implementation, and evaluation to the training of ICT technology talents for industry customers, and only emphasizes the setting of clear learning goals and the formulation of overall talent development rights at the planning stage.

  • A. True
  • B. False

Answer: B

 